Is Mound rd under construction?

Is Mound rd under construction?

Mound Road Reconstruction – INNOVATE MOUND The project started on August 16, 2021 with construction completion in the Summer of 2024. The first phase of construction will occur between M-59 and the Sterling Relief Drain located north of 15 Mile Road.

Is there construction on Big Beaver in Troy?

Work is substantially complete. Concrete slab replacements on Big Beaver along with final clean up and restoration will start in the spring. All work is anticipated to be complete by late June.

Is there construction on m59 in Michigan?

The Hall Road (M-59) Project The project will be constructed in two phases: Phase I, Romeo Plank Road to east of Elizabeth Road, March-November, 2021. Phase II, East of Elizabeth Road to I-94, March-November, 2022.

Is schoenherr closed in Sterling Heights?

Southbound lanes expected to be fully open Tuesday PUBLISHED: November 16, 2021 at 12:31 p.m. | UPDATED: November 17, 2021 at 10:23 a.m. Schoenherr Road in Sterling Heights is again open — mostly — to through traffic following a $4.8 million resurfacing and bridge rehabilitation project.

What is being built at 23 Mile and Mound?

The proposed development is located on the North East corner of 23 Mile & Mound Rd across form the new Amazon fulfillment center in Shelby Township. The new one million square feet facility will generate approximately 1,000 new jobs and add a burst of economic needs for the area.

When was Mound Road built?

In the winter of 1940, Chrysler answered the call and took a bold initiative to build the first tank manufacturing plant on a 113-acre farm field in Warren, Macomb County, Michigan. Today we know this area as the Mound Road Innovative Manufacturing Corridor.

What Mile Road is Big Beaver?

16 Mile
The winner of the “most named” contest goes to 16 Mile (aka Walnut Lake Road, Quarton Road, Big Beaver Road, and Metropolitan Parkway). Along its western stretch are neighborhoods like Greenbriar Village, the Shenandoah Country Club, and the main branch of the West Bloomfield Township Public Library.

Is there any construction on I-75 in Michigan?

12 MILE ROAD CLOSURES STARTING FRIDAY, NOVEMBER 19, 2021 Eastbound and westbound 12 Mile Road at I-75 will have single left or right lane closures from 7 a.m. to 7 p.m. through Friday, November 26, 2021 as crews will be installing temporary bridge supports.

Is I-75 North closed in Michigan?

Freeway: I-75 has lane restrictions in place; however, two lanes remain open in each direction, 8 Mile Road (M-102) to 14 Mile Road, through mid-November 2022.

What is being built behind Amazon in Shelby Township?

What are they building in Shelby Township?

water storage facility
SHELBY TOWNSHIP — During the summer of 2020, Shelby Township exceeded its maximum allowable peak water usage through the Great Lakes Water Authority, particularly in July. The township averaged more than its maximum permissible usage by as much as 10%.

How did Big Beaver Road get its name?

The 1877 History of Oakland County states, “The place derives its name from a large dam, erected by a colony of beavers, across a little brook near the place.” The stream, nearly gone in 1877, was better described as a seasonal creek.